Thursday, December 11, 2008

West Forge: Transferring the Track Plan and Installing the Roadbed

So yes life happens. It's been a while since my previous post about the building of my West Forge practice layout. With all that's been happening in the world I've spent a lot of time working providing my employer with detailed productivity reports to help the hospital staff appropriately and in a cost effective manner, but that's another post. This one is a continuation of what I was working on previously. My 2x3 N scale Pennsy themed layout.

In the above picture you can see what became my method of transferring my track plan. I used XTrkCad to print out a 1:1 scale version of my plan, I choose to trim off the excess paper edges and then taped each piece to the blue board in the proper position. I choose to save paper and not print the empty the middle section. Once that was complete I used a thumb tack to poke holes through the plan into the blue board down the center line of all the rails. You can see I also tested the fit of my turnouts to make sure the program had the correct template. Happily it did size all the parts correctly.



In this photo you see the next two steps I took. I used a black sharpie to darken each pin mark just to make it easier for me to see the lines (and it made the work visible for this photo). I then began to fit my cork roadbed into place by following the darkened center line. To hold down the road bed I used yellow wood glue and standard metal straight pins pushed into the shoulder of the roadbed. I made sure to keep the flat top of the roadbed cleared as much as possible so that I wouldn't run into any issues when I installed the track. This was then all left to dry for a few days.


Here you can see the edge of the finished module with the road bed in place. I've added a small cut hillside to the one corner to add some interest The foam layers are again glued together with yellow wood glue and straight pins. You can also see the edge of the foam where I used plain old duct tape to strengthen and protect the side of the foam. While certainly not a nice piece of fascia the duct tape really did help to the protect the sides from getting too banged up while I was working. This is something I will probably do again when working with any exposed foam.

The final step for the roadbed was to cover everything with a light tan latex paint. I used just a cheap flat latex that was a pale sand color. While it does look very pale in this picture, and on the module, I still think it was better to go lighter here and let the ground foam darken the scenery later on. After I did this I realized that I'll have to paint most of the layout again anyway because I'm going to put sculptamold (of whatever the name of the generic version I bought is) onto the board to add some visual interest and to make it look less like a flat board, but I also wanted to make sure that the yellow glue holding down the road bed was sealed before I ballasted. This may or may not have been a good idea on my part but I was thinking that the really wet water and glue combo might damage the roadbed or weaken the glue that I used on it. Thinking back I believe that yellow glue is supposed to not be washable by water after it cures/drys so this step was probably not needed, but it still felt good to not be looking at plain old blue foam any more.

So next is going to be track, wiring and ballasting I guess. I'll try and get the next post up before Christmas, but who knows I still have a bathroom to finish repairing between now and then also. As usual please feel free to comment and let me know if you think I could have done something better.

Monday, September 15, 2008

West Forge: Sub Roadbed and "Benchwork"

So I choose to do something I haven't seen done before for my bench work. Admittedly i was inspired by some bench work I saw that was built primarily from artist foam core mat board. I built my bench work completely from blue extruded foam. I took a piece of foam that I had in the basement (remember I'm trying to use what I have to build this) and I cut it down to a width of 24 inches. This left me with a none to straight 2x4 foot piece of foam. To make it more rigid and flat I cut halfway in 6 inches from each end and snapped the piece back until they layed flat connected only by the plastic wrapping to the main board. I cut out additional pieces to use as cross braces under the foam top (make sure that you use the same sheet or a sheet you know came from the same store at the same time as I have found different batches can be slightly different thicknesses). I then used yellow wood glue and sewing pins to hold it all together, and left it to dry for about 3 days with weight on the top.


Once it had sit for 3 days it was dry, flat and solid, but still very light. You can easily pick it up with just one finger. Below you can see how I layed out the supports. After the glue dried I removed the large pins (all I had at the time) and replaced them with some flat headed steel pins I picked up the store. I decided to leave the pins in place to keep the foam from shifting if it took a hit (something highly likely to happen in my house).


At this point it's rather nice as I was able to just slide the entire board behind my dresser to keep it away from the kids.

Saturday, September 13, 2008

West Forge: My New Layout

So as I've said before I chose my new trackplan recently. The choice was influenced by a few factors.

  1. I wanted a continuous loop for just running something around and around.
  2. I wanted some spurs to have some type of switching action.
  3. I wanted a passenger station, a signal/Interlock tower and an industry.
  4. It needs to be a small table top layout that I can move around the house right now as we are still doing lots of work on the house (and will be for the foreseeable future).
  5. It needs to be affordable, I am working on paying stuff off and just getting by. I had to dig into my savings account for the money for my GG1 and I don't' want to wipe out my savings on a layout (tempting as it may be).
  6. Considering item #5 above if needed to use as much of the track, equipment and supplies that I already had on hand.
  7. A layout that is somewhat expandable is a large bonus.
After all that I found a nice 2x3 layout on a site in my bookmarks. It fit the bill of giving me something small that I could pull out of a closet set up quickly on a table and run some trains either for myself or my kids. Here is the basic track plan:

The basic premise is that this is set near the town of West Forge, PA, a small rural part of Pennsylvania served by a branch of the PRR. The lower track is the branch line coming in from the PRR mainline it is where set outs will be made for any operations and it is where I hope to later expand this layout with a wraparound shelf that could go along a wall.

Over the next few days I will post additional pictures of the construction that has occurred until I get caught up with where I am now at.

Friday, September 12, 2008

Kato GG-1: It's MINE all MINE!

So I have to admit that I have been a bit cheap when buying my rolling stock and motive power on my layout. Most of my locomotives are either Life-Like Ready To Run pieces that I bought off ebay or Bachman engines that came from sets I've bought over the years. up until now I would have said that my Life-Like N scale PA and SD7 locomotives were my nicest. Well all that changed Wednesday night when I picked up my first ever Kato loco and by far the most expensive loco I now own (it's pricier than even the Lionel O27 I bought for around the tree).

The Kato GG-1 is a beautiful engine. It looks great in the pictures, but I will say that the pictures don't even do it full justice. Out of the box the loco comes "paint shed new". It's got a bit of a gloss finish to it that I at first felt looked a bit like un-painted plastic but it is painted and it's just got a waxed up finish. Great if you are using it as a showpiece, or railfain train on your layout, maybe not what you want if you are running it as an old freight car. Since Kato designed it to pull the Broadway limited it's not a big surprise to me that it's shined up.

All of the Lettering and striping on mine are well done. You can clearly read the words "Fuel" and "Water" along the lower edge of the body.

The engine runs well and is relatively quite especially at low speeds, at least compared to my other locomotives. While I have not yet taken it apart to fully examine the interior it appears to have 6 drive axles (the center sets), and it is well weighted. It came with Magenetic couplers pre-installed, i just needed to insert the metal pins into them.

At $140 for the DC version it's pricy, to me at least, but if you are a Pennsy fan or heavy electric fan it's probably worth it for a very nice piece like this. If you regularly buy nicer motive power than this is probably middle of the road pricing from what I've seen.

All in all I'm glad I picked one up. I'll try and get some pics of mine put online later, but for now you can always see what Kato has on their site at http://www.katousa.com/N/GG1/index.html

Thursday, July 24, 2008

Choosing a Track Plan

So as I said in a previous post while thinking about how to best get my own trains running again I decided to store away my bendtrack modules and put something new together. I started with my old Model Train bookmarks to look for ideas.

I like what Dave Vollmer has done with his door layout, but I wasn't looking for anything quite that size yet. I also liked the "N-Scale layout that grows" book from Model railroader but with all the switches in it the cost was a bit more than I wanted to spend right now. In going thorugh my bookmarks I found a stray one in IE (which was surprising since I rarely use it) for Mini N Scale Track Plans and I found that I really liked a few of these super tiny layouts. So I'm sort of settled on one of the 2'x3' layouts from that site. In thinking about things I've come up with the idea that i will do a small Pennsy themed branch line that services a small community station, and one of the larger industries in town.

So that's where I'm at. I've chosen the layout, the prototype railroad, and some basic structures for it. Now I need to determine what the name and type of industry will be that is serviced by this branch line and I need to keep moving on finishing my structures and sub roadbed. I will put up some pictured of the new layout once download the ones on my camera.

A New Model RR Project

Well the modular layout I'm working on for the WPMRM is coming along great. I missed this past week but I understand our team finished laying the track on the outer loop that we started the previous week and even got a train running on the outer loop.

Even with all that going on I've been wanting to see my own trains run on something other than a loop of ez-track. Not that I have anything against my ex-track it's just that I'm finding I want more than to just have a few cars go around in a circle. So the seed was planted and I began thinking about my own layout. I've opted to scrap the work I've done so far on my bendtrack modules as the track work is just too poorly done and without other bendtrackers in the area I don't have a great incentive to make modules any longer. So I started looking at other peoples small track plans.

While looking those over and before I decided any specifics I knew that I wanted a Pennsy style Interlocking tower. I picked up a small (cheap) Atlas kit just called "Signal Tower" from my local hobby shop and decided to dig in. I used pictures of ALTO and AR towers as my primary guidance. Here are some pictures showing it off.


This is a picture (courtesy of Walthers) of what the raw kit looks like. It's a "molded in color" kit that snaps together.

Here is what mine came out looking like after several nights of work. I wanted it to be heavily weathered as if it had been standing in a remote location for quite some time.

And of course the obligatory scale picture next to a quarter. This little bugger is SMALL. I was actually quite unprepared for just how small and delicate some of the parts were.

All said and done I think I spent about a week working on this almost every night for at least an hour. Which I considered to be a pretty quick build actually. It was for the most part easy to assemble, and not very difficult to weather. I'm just very happy that it came out looking this good. It doesn't look like plastic which is a huge bonus to me.

Wednesday, June 04, 2008

Kato GG1

Well looks like I'm off the hook for June as Kato moved the GG1 release back to August now which now coincides with the Braodway Limited too.

While I don't Model the NEC or any PRR electrified lines now, nor do I plan on modeling Eastern PA, I will probably still get the GG1 just because it's my favorite piece of PRR motive power. While I doubt that it will inspire me to setup overhead wires on my proposed layout right now, who knows what the future might bring. For now I don't even have a great layout, just the two test modules I built a few years ago. When I do finalize my layout plans it will contain some passenger operations and a nice loop for passenger trains to just run on.

Monday, May 12, 2008

Moving SQL Server Databases

This is something that I've had to do a lot lately since we are migrating to a larger HA architecture here at work. This article gives a quick list of dos and don'ts to make your next SQL Migration go smoother.

Moving a Database


Here is also a direct link to the Microsoft kb referenced in the above article, this one tells you how to move users from one server to a new server without needing to recreate them and use sp_change_users_login. Check it out here.