Showing posts with label West Forge. Show all posts
Showing posts with label West Forge. Show all posts

Sunday, January 30, 2011

A Hobby Mash-Up (aka: You Never Forget Your First Doctor)

So admittedly I haven't done any modeling, railroad or otherwise recently. My little layout has been sitting in the corner mostly untouched for months, and my track sketches for a larger more robust layout have been sitting on a shelf or in my My Documents folder also for months. There are doubtless many reason for it, but a large one is likely that the Thanksgiving, Christmas and New Years Holidays all just were here, and I have a nice new TV and Netflix account that I have been enjoying with the family.

One of the "new" things we have discovered on Netflix is Doctor Who. We started with the 2005 Series and have worked both forward and backward in the series. I think we've seen the first, second, third, fourth and ninth Doctors thus far.

Back on the model railroading front most of what I've done has been around operations. I joined OpSig this year in an effort to learn more about operations and maybe even find some local groups that I can guest operate with for a session or two to learn the ropes (if you know of any in Western PA please let me know). While learning operations and building a layout that allows me to run a good session is a goal I have to admit that Structure building really is what I enjoy the most about the hobby. So after breaking all the ice on the drive way and realizing that I was just too sore to do anymore around the house this weekend I thought about pulling out some card stock scratch building supplies and just messing around when I had a great idea. Why not build something that me and the kids would get a kick out of on the layout. Something we had been enjoying on TV currently, say an n-scale TARDIS.

Here is a picture of the mostly finished product on my layout. It's sitting under a tree near the train station. I can't help but think that this just might be the first time the Doctor has been in Pennsylvania. The base needs a bit of trimming and molding to the layout still, but that will come with time as I decide where to keep this piece at.

Here's a close up of the piece. The TARDIS itself came from a Deviant Art site, the sidewalk came from Scale Scenes, one of my favorite sources for card stock modeling products. The figures I bought online from a guy named Jens in a big multipack. They have been custom painted to match the scene as the Ninth Doctor and Rose. If you want to duplicate this Take the Image from Deviant Art and scale it to around 900 DPI. I did some simple math and a bit of trial and error to get that figure. If you want you can do what I did and rotate the page so that it's square to the TARDIS pattern and cut it down and then print it out to the right height. I found that somewhere around 1.6 in high for the pattern was pretty good to make the Doctor's head be at about the right height on the door.
All in all this was a quick project that I just threw together with the kids so that we weren't totally bored this weekend while my shoulder was healing from all the work around the house. It was pretty fun to watch the kids look for it on the layout after I installed it too. Even my four year old was able to find and it recognize it. While it's simple, made of paper and not the greatest it does look nice when viewed from the 2 foot rule. Now let's just hope some major disaster doesn't follow the Doctor to West Forge.

Friday, January 01, 2010

West Forge Layout: Operations!

First off Happy New Year everyone! I hope that everyone has a great holiday weekend.


Now onto the topic of my post. I have to admit that aside from playing with my kids Thomas train layout I've never really operated a layout of any type except for the ones that went in circles underneath Christmas trees. I do recall as kids my sister and I making the train or the trolly car go around a few times and then stopping it at certain spots that we decided were stations to pickup and drop off passengers. However, I've never done anything that I would really consider operations. The club I belong to doesn't do operations yet, and I don't seem to know anyone in the western PA area that does this at home. If you happen to be in Western PA and in need of crew member let me know.

Anyway, having never done this before and using a track plan from a book I was left with trying to figure all this out myself (aren't model railroading books great!). I have to say I was really hoping that I liked it after I went through all the work to build this stuff and get it running well. So today after watching a movie with the kids and my wife I sat down with a notebook, pencil and track plan and tried to figure out how to operate my little module. The very first thing I realized is that this module lacks anything that even resembles a run around. This was clearly another rookie mistake on my part that meant that all my switching moves had to be pre-planned and the cars positioned properly in the consist. Once I got over that problem I was able to come up with a 12 step operation plan that involved switching four locations: Nathan's Warehouse, C & E Hardware, The General Store/Railway Express Agency, and the Lumber Yard.

After my kids went to bed I decided that it was time to try this plan out. My original goal when I started planning this layout was to be able to operate the layout for 15 minutes with a crew of 1 person. I was pretty sure my plan would do that and maybe take even longer. In the end though the operation plan took just over 12 minutes to complete, but that time didn't include using the passenger station at all. I decided that I can either add passenger operations to this plan or change that siding to an additional small industry to add a few more minutes to the operations. Overall though I'm very pleased with the way things worked. I found a few small track issues I need to work on on the spurs, but aside from that I had a very pleasant 12 minutes running my trains in more than just a loop.

I do think that larger scale operations would be a great deal of fun, and look forward to trying those someday. All of this makes me happy as I have a better understanding of operations now, and that just became one more thing that I have learned from this little 2'x3' layout.

Friday, December 19, 2008

West Forge: Track Detailing

This turned out to be a fun project to let the kids help out with. I decided to use acrylic tube paints for coloring the ties. granted they will not hold up as well as something like Polly Scale or Model Masters would have, but I had them and they are easy enough to clean up that I wasn't too worried about the kids spilling anything. Plus I really didn't feel like dragging the air brush out for this. I choose a dark brownish red for the base color. I'm really not sure why I choose that color. It went on and dried very red looking rather than a dirty brow. Already the track is looking better than the glossy black color it comes.

Here is the layout after the red paint was dry. Again not sure why I went so red. It's pretty clear here that the color is too red. You can also see the cut hillside I added to the corner here has the scultpamold but on it now.
This is a close up of the track after I decided to dry brush a grayish brown over top of the red. Things still look overly red here as the sides of the ties are red in a lot of places where the dry brushing didn't touch. Once the ballast is down it should cover up a lot of that. After this shot was taken I wound up replacing the bad section of track (seen as the top track in this shot) and things began to run much more smoothly.

Next step: Ballast!

Monday, December 15, 2008

West Forge: Laying the Track

Now I wish I could say that my track work was great, heck I'd even be happy to say it was good, but at best my track work is passable. That's one of the reasons I decided to start with such a small project. I had a bunch of code 80 flex track, cork and blue foam left over from previous projects and that meant that this project was going to be a cheap way to improve my skills in N Scale.

To get started I began test fitting my track at the least forgiving areas my turnouts and crossover. This let me start to get a feel for where I also wanted to break out my power blocks since initially this layout will be all DC based. I used a blue sharpie this time to start noting where I needed to install insulators and what looked like good spots for my feeder wires. Once I was happy with a particular pieces location I used my dremel tool and a pair of tin snips to cut my flex track and then soldered it all together. I really have to admit that I might choose to not solder any special track next time like the cross over and turnouts as later when I had to clean up some poor track work I nearly ruined a turnout. Note that the solder removing ribbon from Radio Shack works wonders to help get a piece of track free.

Here you can see the first half of the inner and outer loops completed. Looks good doesn't it? Well it wasn't I had to remove almost the entire inner loop seen here because I somehow managed to point the soldered joint on that section. Nothing would run properly over that spot. Next time I will really have to pay more attention to this part and not rush it so much. I think i was over confident in my own soldering abilities. I've been soldering for years and years, but soldering track is a lot different than electronics.

This is what the track looked after it was all layed. Again on this half I did have to replace a second section of the inside loop due to a poor connection between two pieces of flex track. You can also see the blue markings noting where the insulators are installed at.

This is a close up of the connection to the rest of the branch that isn't modeled. At some point if this small module works out well I'd like to make it a semi-permanent piece of a larger layout that shows the rest of the branch and possible an interchange with the Pennsy main line and maybe an interchange with another line (NYC, Bessemer or B&O probably). At this point I really haven't given much thought to what comes next. Also in this shot you can see the ground throws that I installed. I have never used these before but I decided to use them this time because I wasn't using switch motors and didn't want to be using those huge atlas switch machines. For a few dollars apiece they are well worth the investment to me. They have an internal spring that makes sure there is some tension on the points in both directions and they lock slightly at each end to help maintain the points connection to the rails. Plus they were super easy to install.

As I mentioned above I tried to repair some of the bad connections before I replaced them. Here is my example of what not to do. I used a few larger nails to try and push the inside rail into a better position then I attempted to redo the solder, but that just didn't work. I wound up cutting this whole piece out and putting fresh flex track in. You can also see the newly installed feeder wires and spst power switch that I installed to turn this section of rail on and off from the power bus.



Thursday, December 11, 2008

West Forge: Transferring the Track Plan and Installing the Roadbed

So yes life happens. It's been a while since my previous post about the building of my West Forge practice layout. With all that's been happening in the world I've spent a lot of time working providing my employer with detailed productivity reports to help the hospital staff appropriately and in a cost effective manner, but that's another post. This one is a continuation of what I was working on previously. My 2x3 N scale Pennsy themed layout.

In the above picture you can see what became my method of transferring my track plan. I used XTrkCad to print out a 1:1 scale version of my plan, I choose to trim off the excess paper edges and then taped each piece to the blue board in the proper position. I choose to save paper and not print the empty the middle section. Once that was complete I used a thumb tack to poke holes through the plan into the blue board down the center line of all the rails. You can see I also tested the fit of my turnouts to make sure the program had the correct template. Happily it did size all the parts correctly.



In this photo you see the next two steps I took. I used a black sharpie to darken each pin mark just to make it easier for me to see the lines (and it made the work visible for this photo). I then began to fit my cork roadbed into place by following the darkened center line. To hold down the road bed I used yellow wood glue and standard metal straight pins pushed into the shoulder of the roadbed. I made sure to keep the flat top of the roadbed cleared as much as possible so that I wouldn't run into any issues when I installed the track. This was then all left to dry for a few days.


Here you can see the edge of the finished module with the road bed in place. I've added a small cut hillside to the one corner to add some interest The foam layers are again glued together with yellow wood glue and straight pins. You can also see the edge of the foam where I used plain old duct tape to strengthen and protect the side of the foam. While certainly not a nice piece of fascia the duct tape really did help to the protect the sides from getting too banged up while I was working. This is something I will probably do again when working with any exposed foam.

The final step for the roadbed was to cover everything with a light tan latex paint. I used just a cheap flat latex that was a pale sand color. While it does look very pale in this picture, and on the module, I still think it was better to go lighter here and let the ground foam darken the scenery later on. After I did this I realized that I'll have to paint most of the layout again anyway because I'm going to put sculptamold (of whatever the name of the generic version I bought is) onto the board to add some visual interest and to make it look less like a flat board, but I also wanted to make sure that the yellow glue holding down the road bed was sealed before I ballasted. This may or may not have been a good idea on my part but I was thinking that the really wet water and glue combo might damage the roadbed or weaken the glue that I used on it. Thinking back I believe that yellow glue is supposed to not be washable by water after it cures/drys so this step was probably not needed, but it still felt good to not be looking at plain old blue foam any more.

So next is going to be track, wiring and ballasting I guess. I'll try and get the next post up before Christmas, but who knows I still have a bathroom to finish repairing between now and then also. As usual please feel free to comment and let me know if you think I could have done something better.

Saturday, September 13, 2008

West Forge: My New Layout

So as I've said before I chose my new trackplan recently. The choice was influenced by a few factors.

  1. I wanted a continuous loop for just running something around and around.
  2. I wanted some spurs to have some type of switching action.
  3. I wanted a passenger station, a signal/Interlock tower and an industry.
  4. It needs to be a small table top layout that I can move around the house right now as we are still doing lots of work on the house (and will be for the foreseeable future).
  5. It needs to be affordable, I am working on paying stuff off and just getting by. I had to dig into my savings account for the money for my GG1 and I don't' want to wipe out my savings on a layout (tempting as it may be).
  6. Considering item #5 above if needed to use as much of the track, equipment and supplies that I already had on hand.
  7. A layout that is somewhat expandable is a large bonus.
After all that I found a nice 2x3 layout on a site in my bookmarks. It fit the bill of giving me something small that I could pull out of a closet set up quickly on a table and run some trains either for myself or my kids. Here is the basic track plan:

The basic premise is that this is set near the town of West Forge, PA, a small rural part of Pennsylvania served by a branch of the PRR. The lower track is the branch line coming in from the PRR mainline it is where set outs will be made for any operations and it is where I hope to later expand this layout with a wraparound shelf that could go along a wall.

Over the next few days I will post additional pictures of the construction that has occurred until I get caught up with where I am now at.